الانتقال إلى المحتوى

سؤال عملي مهم


mona_2010

Recommended Posts

السلام عليكم
سوف نقوم بعمل UPGRADE للابلكشن المستخدم في الشركة

وان شاء الله راح نعمل setup لاوراكل 11g .2 الان كمبتدئة dba

طلب مني senior هذا السؤال

Please Mona come-up with good proposal for Oracle 11.2 memory optimization and performance fine-tuning configuration as well.

• Memory SGA & PGA configuration since the machine has 16G of memory and will be in 64bit
• Logs – Control Log, Redo logs and Recovery Logs



ممكن تساعدوني في هذا الموضوع

منى
جدة

رابط هذا التعليق
شارك

hi
which type of upgrade you will do
clone or dbua or manual upgrading ???
if you will setup db from scratch not upgrading from release to higher release
you can specify 8G to all SGA
log buffer = 512* number of processors
redo log files 3 or 4 groups in different units each group 300M
same control files create more control files in different units
not more that 4 control files recommended

attention: you have the ability to increase some parameters to have the best practice

regards

رابط هذا التعليق
شارك

انضم إلى المناقشة

يمكنك المشاركة الآن والتسجيل لاحقاً. إذا كان لديك حساب, سجل دخولك الآن لتقوم بالمشاركة من خلال حسابك.

زائر
أضف رد على هذا الموضوع...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   تمت استعادة المحتوى السابق الخاص بك.   مسح المحرر

×   You cannot paste images directly. Upload or insert images from URL.

جاري التحميل
×
×
  • أضف...

برجاء الإنتباه

بإستخدامك للموقع فأنت تتعهد بالموافقة على هذه البنود: سياسة الخصوصية