بتاريخ: 3 يونيو 200917 سنة comment_159114 السلام عليكم ورحمة الله وبركاتهانا عندي مشروع في البنية التحتيه او االاساسيه لشركة ماوانا بصراحه ما اعرف كيف ابدآعلماانه لم بقي وقت يسعفني ارجو منكم مساعدتي في هذا المشروعاو اذا يوجد مشروع جاهز او مقارب له ورح استفيد منه يا ليت توضحونه لي بليز انا والله في امس الحاجه لهوهذي صيغه المشروع LG Infrastructure LG is an electronic manufacturing company that consists of various departments like “HumanResource”, “Product and Services”, “Sales & Support”, “Assembling Materials” etc. Department are categorized by its type like M: Manufacturing, S: Sales, U: Support etc. .LG has large infrastructure in terms of various buildings with multiple floors. Each department may be located in more than one building. A building has more than one floor and each floor has many rooms. In many rooms there are more than one cubicle sections where employees are sitting. Any cubical is considered as empty if there is no employee assigned to it (shown in figure 1). A department consists of more than one employee and no employee belongs to more than one department. Main office of each department is considered as main location in a building, however rooms are belong to department and those rooms may be located in more than one building. In one room, only employees from one department are located. Each employee works under some Manager (who is also employee), each Manager works under Director of this company.The following relations represent the LG infrastructure as described in the above case brief (need to be modified and normalized as per ER design & required forms).Employee(employee_no, first_name, last_name, tel_no, email, dno)Department(dno, department_name, location)Buidling(B_No, B_Name, Location) تقديم بلاغ
بتاريخ: 3 يونيو 200917 سنة comment_159179 وعليكم السلام ورحمة الله (shown in figure 1). اين هذا الشكل او الرسم مرفق ملف به رسمة ال ERD تقديم بلاغ
انضم إلى المناقشة
يمكنك المشاركة الآن والتسجيل لاحقاً. إذا كان لديك حساب, سجل دخولك الآن لتقوم بالمشاركة من خلال حسابك.